| Area I |
| The Area I project will make central sewer available to about 929 properties. The vacuum pump station and some main lines are under design to determine the sizing requirements needed for the shared structure housing the Bahia Vista interconnect booster pump station. Construction of the vacuum pump station and the collection system are not funded at this time. |
|

| |
|